GET THE QUICK START MANUAL

See How the CF2140
RF Eval Board Works

Download the Quick Start Manual and get a step-by-step walkthrough of the CF2140 RF Eval Board — pinout, jumper setup, and how to control and test all four switch paths with a multimeter and SMA connections.

Control Four RF Switch Paths With the Flip of a Switch

Four SMA input/output pairs, on-board toggle switches, a full pinout and wiring diagram: the manual shows you exactly what evaluating the CF2140 looks like, step by step.

Curious about switching dynamics? It also covers the automated cycling procedure used to validate the hot-switching reliability behind Cenfire’s patented contact technology.

Download the manual and see how the CF2140 performs

cenfire

The first and only Si-based, CMOS compatible, spring platform for switching, a technology that enables zero leakage off state and conduction through a fully metallic path without the fatigue caused by metal springs of the past.

Get In Touch

75 Robin Hill Road, Goleta, CA 93117

© 2026 All Rights Reserved.